Frident Kuqi and Halil Gashi win the 62 million USD auction to b...
/ 2026-10-26 22:13:42Focus
The moving ship which will produce energy has just entered the bay of Vlora.
She will stay for about an hour at anchor in front of the entrance to the Vlora-1 (PIA) terminal, where she will unload the two generator ships after having them loaded on top of her.
Meanwhile, Vlora citizens are gathering in front of the port terminal of Vlora to protest.
They protest as the ship has a megatec which will produce diesel power.
According to them, this will damage biodiversity and tourism in this coastal city, which will turn into an industrial area.